Frame Tent Instructions |
|||||||||||
|
1) |
Pre-site inspection |
||||||||||
|
Call you local utility companies prior to installation for any underground obstructions. |
|||||||||||
|
2) |
Installing the Frame Work |
||||||||||
|
Layout the frame pipe & fittings according to the diagram. |
|||||||||||
|
( See attached sheet(s) ) |
|||||||||||
|
Attach the perimeter pipe to the corner fittings & the "T's" with carriage bolts |
|||||||||||
|
Put the pipes that go from the crown to the corners together. Then the pipes from the crown to |
|||||||||||
|
the Regular ( or side ) "T's". |
|||||||||||
|
3) |
Lacing the Tent |
||||||||||
|
( omit if it is a 1 piece top) |
|||||||||||
|
Lay the tent sections over the framework, overlap the canvas with the grommet side on top of the laces. |
|||||||||||
|
Starting at the grommet closest to the Top, push the lace up through the grommet hole. |
|||||||||||
|
Next push up the next lace through the second grommet. Take the second lace & go through the first lace |
|||||||||||
|
loop and pull down to the third lace, take the third lace & put through the second lace loop and so on. |
|||||||||||
|
On the last lace, tie off. |
|||||||||||
|
4) |
Lay the canvas over the framework. Strap the tent around the perimeter. | ||||||||||
|
5) |
Lay out the ropes perpendicular to the tent. Drive the stakes into the ground to about 8" from the top & |
||||||||||
|
3' from the tent leg and tie off the tent. |
|||||||||||
|
6) |
Raising the Tent |
||||||||||
|
Raise the tent into the wind. Insert the legs for that side. Raise the opposite side & insert the legs. |
|||||||||||
|
Tie off the ropes to the stakes. Tighten the tent top to the frame. |
|||||||||||
![]() |
|||||||||||
|
8) |
Take down |
||||||||||
|
Loosen the ropes and disassemble in reverse order |
|||||||||||
|